Leprino Foods
Leprino Foods chose FZ as their food processing system integrator when they needed help on their chiller addition and brine mixer system.
Brine Mixer System, Allendale, MI
Feyen Zylstra was contracted to install the food processing control and instrumentation for the Brine Mixing System at the Leprino Foods Production Facility in Allendale, MI. This project involved the installation of 120 VAC distribution circuits, machine control panels, and all the field wiring for all instrumentation devices. This included both analog and digital inputs and outputs for pressure, temperature, flow, and position to make for a complete working system.
Chiller Addition, Remus, MI
Feyen Zylstra also performed the electrical work associated with the addition of two chillers at the Leprino Foods in Remus, MI. This project involved a building expansion, a service upgrade, and the installation of the conduits and conductors associated with the chillers themselves.
Customer:
Lamar Construction Company
Location:
Allendale, MI & Remus, MI
Related Keywords:
Electrical, Installation, Electrical Service, Controls, Engineering, Automation, Instrumentation, Control Panels, Chillers, Food Processing, FDA Regulations, Building Expansion, Plant Floor Electrical, Leprino Foods