FZ logo
FZ Endeavor logo
  • About Us
  • Services
        • Electrical Innovation

          Talented electricians, technicians, and engineers customize comprehensive electrical solutions.

          Learn More
        • Electrical Services

          Electrical solutions from large-scale projects to routine maintenance.

          Learn More
  • Resources
        • Case Studies

          Over 40 years of experience solving our customer’s most complex problems.

          Learn More
        • Materials

          Industry insight and capabilities designed for success.

          Learn More
  • Careers
  • Blog & News
  • Contact
  • Design Engineering
  • VDC
  • Manufacturing
  • DO NOT DELETE THIS – Should be last item always
  • Electrical Solutions
  • Systems Solutions
  • Audio Visual Solutions
  • Outdoor Solutions
  • DO NOT DELETE THIS – Should be last item always
  • IIoT & Digital Solutions
  • Industrial Networking & Cyber Security
  • Factory Automation & Robotics
  • Panel Build
  • DO NOT DELETE THIS – Should be last item always

Data Center Customer Phase A & B

December 10, 2025

Data Center Customer

Data Center Customer

Mission-Critical Electrical Partner

Our team provided both electrical project phases for a 200,000+ square foot data center, one of the largest and most advanced of its kind in the Eastern United States. Leveraging our team's experience and expertise when it comes to mission-critical electrical work, we were able to complete both project phases on time and without any safety incidents.

Phase A

Our scope of work included installing three sophisticated electrical infrastructure pathways to allow for varied modes of electrical power redundancy. This creates information that is protected and secured by ensuring that the structure will never lose connectivity. We also installed the temperature controls and monitoring systems for the data racks as well as the HVAC control equipment.

Phase B

After successfully completing the first project phase, our scope of work for Phase B included installing an uninterrupted power system, a generator power system, and three redundant power system switchgears. We also installed all the switchgears for medium voltage, unit substations, and OPS systems, including the installation of raceways that allow the power distribution rooms and switchgears to be fed. The facility’s entire critical infrastructure was installed during this project phase.

Related Keywords:
Mission Critical, Data Center, Electrical Partner, Electrical Contractor, Electrical Infrastructure, Electrical Power Redundancy, HVAC Control Equipment, Data Racks, Uninterruptible Power System, Generator Power System, Redundant Power System Switchgears, Medium Voltage, OPS systems

Related Case Studies

Automotive Data Center

12/10

End User Data Center End User Data Center End User Data Center When our customer..

Learn More

Data Center Customer Phase A & B

12/10

Data Center Customer Data Center Customer Mission-Critical Electrical Partner Our team provided both electrical project..

Learn More

Austin Peay State University

09/22

Austin Peay State University Austin Peay State University Higher Education Electrical Construction Feyen Zylstra is..

Learn More

Trident Medical Center Surgery Addition and Renovation

07/16

Trident Medical Center Surgery Addition and Renovation Trident Medical Center Surgery Addition and Renovation Electrical..

Learn More

NDA Healthcare

07/01

NDA Healthcare NDA Healthcare Electrical Healthcare Renovation Project Feyen Zylstra completed a 12,784 square foot..

Learn More
University of Michigan Health-West logo

University of Michigan Health-West

05/27

University of Michigan Health-West University of Michigan Health-West Formerly known as Metro Health A 19-Year..

Learn More
Corewell Health logo

Corewell Health Grand Rapids Outpatient Center

05/27

Corewell Health Grand Rapids Outpatient Center Corewell Health Grand Rapids Outpatient Center Low Voltage Partner..

Learn More
Corewell Health logo

Corewell Health Place Building A

05/27

Corewell Health Place Building A Corewell Health Place Building A Healthcare Low Voltage The new..

Learn More
airplane

Confidential Aerospace Customer FGI Project

04/30

Confidential Aerospace Customer FGI Project Confidential Aerospace Customer FGI Project Feyen Zylstra partnered with HITT..

Learn More
airplane flying above

Confidential Aerospace Customer Stall 10 Project

04/30

Confidential Aerospace Customer Stall 10 Project Confidential Aerospace Customer Stall 10 Project Feyen Zylstra partnered..

Learn More

Questions about this case study?

FZ logo

Safety. Professionalism. Integrity. It’s how we’ve been shaping the electrical industry with innovative solutions since 1980.

Feyen Zylstra Best and Brightest Winner

Useful Links

  • About Us
  • Services
  • Case Studies
  • Careers
  • Blog & News
  • Contact Us

Services

  • Design Services
  • Electrical Solutions

Stay In Touch

Terms and Conditions
Privacy Policy
© 2023 Feyen Zylstra