FZ_logomark_4x-min
FZ_Endeavor_logo lockup_4x-min
  • About Us
  • Services
        • Electrical Innovation

          Talented electricians, technicians, and engineers customize comprehensive electrical solutions.

          Learn More
        • Electrical Services

          Electrical solutions from large-scale projects to routine maintenance.

          Learn More
  • Resources
        • Case Studies

          Over 40 years of experience solving our customer’s most complex problems.

          Learn More
        • Materials

          Industry insight and capabilities designed for success.

          Learn More
  • Careers
  • Blog & News
  • Contact
  • Design Engineering
  • VDC
  • Manufacturing
  • DO NOT DELETE THIS – Should be last item always
  • Electrical Solutions
  • Systems Solutions
  • Audio Visual Solutions
  • Outdoor Solutions
  • DO NOT DELETE THIS – Should be last item always
  • IIoT & Digital Solutions
  • Industrial Networking & Cyber Security
  • Factory Automation & Robotics
  • Panel Build
  • DO NOT DELETE THIS – Should be last item always

Four Seasons Hotel

December 17, 2019

Four Seasons Hotel

Four Seasons Hotel

Design Assist High Rise Electrical Construction

As the first Tennessee location, the Four Seasons upscale hotel offers 230 hotel rooms, 140 residential units, a world-class spa, and an array of lavish amenities to the Nashville skyline. Feyen Zylstra provided the complete electrical tenant and build out for the 41-story, 810,000 square foot building. Our team was also responsible for the structured cabling, fire alarm, and AV package.

Our Design Services team was involved for over a year prior to the project breaking ground, meeting with the owners and engineering team to develop finalized construction documents. By providing preliminary BIM, we were able to determine the true cost of anticipated design changes, provide feedback for the internal flow of conduit throughout the facility, and identify equipment space requirements within the design.

Having to maneuver COVID-related material shortages and shipping issues were considerable challenges our team had to overcome. With the project being heavily affected due to these COVID-related obstacles, our team relied on FZ’s internal resources and national supply pool to source and secure materials in accordance to the schedule.

As a difficult and multi-faceted project, our field team worked tirelessly, providing the dedication and expertise needed to provide a quality facility.

Contract Type:
Design Assist

Customer:
Hunt Construction

Location:
Nashville, TN

Related Keywords:
Electrical Construction, Hotel, Hospitality, Tenant, Build Out, Low Voltage Systems, Design, Design Services, Design Engineering, Building Information Modeling, BIM, Commercial, Prefabrication, Fabrication, Prefab, High-rise, High Rise, Four Seasons Hotel, Design Assist high rise electrical construction, Nashville electrical contracting, Nashville electrical construction

Related Case Studies

interior of vos glass

Vos Glass

01/19

Vos Glass Vos Glass For over 40 years, Vos Glass has provided top-of-the-line, professional glazing..

Learn More
transformer oil study

Local Food & Beverage Manufacturer

05/06

For many years, our team has been providing ongoing preventative maintenance services for their manufacturing..

Learn More

Bradford White Preventative Maintenance

01/14

FZ performs preventative maintenance for Bradford White in order to extend equipment lifespan, improve production,..

Learn More

Graphic Packaging International

12/15

FZ is Graphic Packaging's in-house data partner, providing preventative maintenance, network cabling, and fiber installation..

Learn More
electrical and design assist for GCRMC

Gerald Champion Regional Medical Center

12/02

FZ served as a Design Assist partner and electrical lead on Gerald Champion Regional Medical..

Learn More

MidMichigan Health

11/15

As a Design Assist partner, FZ provided all of the lighting solutions on MidMichigan Health’s..

Learn More
Board room - av solutions

Greenleaf Trust

10/19

FZ designed, programmed, and installed the new Audio Visual system for Greenleaf Trust's Trading Center,..

Learn More
Mercantile Bank in Grand Rapids | Emergency power system

Mercantile Bank Emergency Power System

09/14

With the nature of their work hinging on secure and consistent power, Mercantile Bank decided..

Learn More
Protestant Theological Seminary entrance

Protestant Reformed Seminary

09/03

When the Protestant Reformed Seminary needed help updating their antiquated AV system, they turned to..

Learn More
automotive manufacturer

Automotive Part Manufacturer

09/02

FZ has served as a dedicated partner for a local automotive part manufacturer providing controls,..

Learn More

Questions about this case study?

Feyen Zylstra_logo lockup_4x-min

Safety. Professionalism. Integrity. It’s how we’ve been shaping the electrical industry with innovative solutions since 1980.

Useful Links

  • About Us
  • Services
  • Case Studies
  • Careers
  • Blog & News
  • Contact Us

Services

  • Electrical Innovation
  • Electrical Services

Stay In Touch

Terms and Conditions
Privacy Policy
© 2019 Feyen Zylstra