FZ_logomark_4x-min
FZ_Endeavor_logo lockup_4x-min
  • About Us
  • Services
        • Electrical Innovation

          Talented electricians, technicians, and engineers customize comprehensive electrical solutions.

          Learn More
        • Electrical Services

          Electrical solutions from large-scale projects to routine maintenance.

          Learn More
  • Resources
        • Case Studies

          Over 40 years of experience solving our customer’s most complex problems.

          Learn More
        • Materials

          Industry insight and capabilities designed for success.

          Learn More
  • Careers
  • Blog & News
  • Contact
  • Design Engineering
  • VDC
  • Manufacturing
  • DO NOT DELETE THIS – Should be last item always
  • Electrical Solutions
  • Systems Solutions
  • Audio Visual Solutions
  • Outdoor Solutions
  • DO NOT DELETE THIS – Should be last item always
  • IIoT & Digital Solutions
  • Industrial Networking & Cyber Security
  • Factory Automation & Robotics
  • Panel Build
  • DO NOT DELETE THIS – Should be last item always

Mercantile Bank Emergency Power System

September 14, 2021

Mercantile Bank

Mercantile Bank Emergency Power System

Grand Rapids Emergency Power Installation

With the nature of their work hinging on secure and consistent power, Mercantile Bank decided that it was time to update their emergency power system. By replacing their existing 500Kw generator with two 200Kw generators they would increase the system's reliability and redundancy.

When it came time to replace the outdated generator, our team disconnected the power during a weekend-long planned outage. During the outage, we tied a temporary generator into the transfer switch to provide redundant, continuous power throughout the project. With the generator being situated within a concrete enclosure in the parking lot, our team used a crane to remove the outdated generator and lower in the two new generators. After the two new generators were installed, wired, and tested our team performed a second weekend-long planned outage where we disconnected power from the temporary generator and hooked it up to the new generators. With the updated emergency power system, in the case of an outage, the entire facility will remain fully operational.

Throughout the project, our team worked directly with Mercantile Bank, managing other trades in order to stay on schedule.

Customer:
Mercantile Bank

Location:
Grand Rapids, MI

Related Keywords:
emergency power system, commercial, office building, bank, 500kw generator, 200kw generator, generator

Related Case Studies

Airplane flying in the sky above on a partly cloudy day.

Confidential Aerospace Customer FGI Project

04/30

Confidential Aerospace Customer FGI Project Confidential Aerospace Customer FGI Project Feyen Zylstra partnered with HITT..

Learn More
Small blue and white airplane from overhead, on top of a light pink background

Confidential Aerospace Customer Stall 10 Project

04/30

Confidential Aerospace Customer Stall 10 Project Confidential Aerospace Customer Stall 10 Project Feyen Zylstra partnered..

Learn More
Airplane Wing over Cloud Sky

Confidential Aerospace Customer Manual Built Tooling Line

04/30

Confidential Aerospace Customer Manual Built Tooling Line Confidential Aerospace Customer Manual Built Tooling Line When..

Learn More
Blue, navy, and white lines with dotted ends forming a technical, wiring-like pattern on top of a teal background.

Confidential Data Center Customer

04/30

Confidential Data Center Customer Confidential Data Center Customer 180MW Greenfield Data Center Feyen Zylstra was..

Learn More

Michigan Milk Producers

12/10

Michigan Milk Producers Michigan Milk Producers Sustainable Electrical Solutions Feyen Zylstra is proud to support..

Learn More

Duo-Form Plastics

10/16

Duo-Form Plastics Duo-Form Plastics Design Build New Construction Partner For the past 50 years, Duo-Form..

Learn More

Vanderbilt University Garland Hall

07/16

Vanderbilt University Garland Hall Vanderbilt University Garland Hall Historic Electrical Renovation and Expansion When the..

Learn More

Owen Graduate School of Management

05/30

Feyen Zylstra expanded and renovated Vanderbilt University's Owen Graduate School of Management, merging historic charm..

Learn More

Central Wastewater Treatment Plant

11/08

Central Wastewater Treatment Plant Central Wastewater Treatment Plant Electrical Wastewater Treatment Plant Partner Nashville’s Central..

Learn More

J-Star Motion

09/01

J-Star Motion J-Star Motion As the leading supplier of linear actuators and lifting columns, J-Star..

Learn More

Questions about this case study?
Let us know.

Feyen Zylstra_logo lockup_4x-min

Safety. Professionalism. Integrity. It’s how we’ve been shaping the electrical industry with innovative solutions since 1980.

Feyen Zylstra Best and Brightest Winner

Useful Links

  • About Us
  • Services
  • Case Studies
  • Careers
  • Blog & News
  • Contact Us

Services

  • Design Services
  • Electrical Solutions

Stay In Touch

Terms and Conditions
Privacy Policy
© 2023 Feyen Zylstra