FZ logo
FZ Endeavor logo
  • About Us
  • Services
        • Electrical Innovation

          Talented electricians, technicians, and engineers customize comprehensive electrical solutions.

          Learn More
        • Electrical Services

          Electrical solutions from large-scale projects to routine maintenance.

          Learn More
  • Resources
        • Case Studies

          Over 40 years of experience solving our customer’s most complex problems.

          Learn More
        • Materials

          Industry insight and capabilities designed for success.

          Learn More
  • Careers
  • Blog & News
  • Contact
  • Design Engineering
  • VDC
  • Manufacturing
  • DO NOT DELETE THIS – Should be last item always
  • Electrical Solutions
  • Systems Solutions
  • Audio Visual Solutions
  • Outdoor Solutions
  • DO NOT DELETE THIS – Should be last item always
  • IIoT & Digital Solutions
  • Industrial Networking & Cyber Security
  • Factory Automation & Robotics
  • Panel Build
  • DO NOT DELETE THIS – Should be last item always

West Michigan Hispanic Chamber of Commerce

August 13, 2026

West Michigan Hispanic Chamber of Commerce

West Michigan Hispanic Chamber of Commerce

Commercial Electrical Solutions

The West Michigan Hispanic Chamber of Commerce's new headquarters was designed to serve as a hub for business development, professional growth, and community engagement throughout West Michigan. The facility provides modern office, meeting, and event spaces that support the Chamber's mission of empowering Hispanic-owned businesses and fostering economic growth across the region. The Chamber serves hundreds of members and acts as a key resource for entrepreneurs, professionals, and organizations throughout the community.

Feyen Zylstra provided the complete electrical installation for the new facility, delivering the infrastructure necessary to support the building's diverse operational, event, and technology needs. Our team installed the building's primary electrical distribution system, including the main distribution panel, multiple subpanels, lighting control panels, and transformer connections that deliver reliable power throughout the facility.

In addition to the electrical distribution system, FZ installed general power throughout the building, including receptacles, floor boxes, furniture power, HVAC equipment connections, rooftop unit power, automatic door systems, elevator-related electrical components, and exterior power infrastructure. The project also included the installation of interior and exterior lighting systems ranging from decorative fixtures and pendant lighting to site lighting, bollards, flagpole lighting, signage power, and a prominent architectural fixture within the main event space.

To enhance building performance and energy efficiency, FZ implemented an advanced nlight control system in partnership with West Michigan Lighting. This solution incorporated occupancy sensors, smart switches, touch-screen controls, power packs, and daylight harvesting capabilities, providing the Chamber with greater control, flexibility, and long-term operational efficiency.

Despite significant challenges, including winter conditions that required underground raceway installation in frozen ground following delays in the building's precast panel delivery, FZ maintained progress on an aggressive construction schedule. Success required extensive coordination with multiple trades, the design team, and specialty contractors throughout construction. Additional safety planning and confined space training were necessary to coordinate critical electrical installations associated with the elevator systems and other building infrastructure.

Throughout the project, FZ worked closely with the project's architects and engineers to help align the electrical systems with the building's intended design vision while ensuring compliance with applicable codes and standards. Our Service team also supported the project during key utility shutdowns, assisting with transformer disconnections and re-terminations to keep the project moving forward safely and efficiently.

By combining detailed planning, strong trade coordination, and technical expertise, Feyen Zylstra delivered a reliable electrical infrastructure that will support the West Michigan Hispanic Chamber of Commerce's mission and continued growth for years to come.

Customer:
West Michigan Hispanic Chamber of Commerce

Location:
Grand Rapids, MI

Related Keywords:
Electrical, Commercial, Exterior Lighting, Interior Lighting, Control System, Power, Distribution Panel, Panels, Energy Efficiency,

 

Related Case Studies

West Michigan Hispanic Chamber of Commerce

08/13

FZ provided the complete electrical installation for the new facility, delivering the infrastructure necessary to..

Learn More
Michigan State University

Michigan State University Campbell Hall

07/09

When MSU decided to renovate their existing Case Hall dining facility, FZ was ready to..

Learn More

Northern Michigan Manufacturer

07/09

FZ performs preventative maintenance for Bradford White in order to extend equipment lifespan, improve production,..

Learn More

Michigan Milk Producers Cottage Cheese Plant

06/24

Michigan Milk Producers Michigan Milk Producers Reliable Electrical Partner As a leading dairy cooperative, Michigan..

Learn More

Midwest Manufacturing Customer

05/08

FZ performs preventative maintenance for Bradford White in order to extend equipment lifespan, improve production,..

Learn More

Automotive Data Center

12/10

End User Data Center End User Data Center End User Data Center When our customer..

Learn More

Data Center Customer Phase A & B

12/10

Data Center Customer Data Center Customer Mission-Critical Electrical Partner Our team provided both electrical project..

Learn More

Austin Peay State University

09/22

Austin Peay State University Austin Peay State University Higher Education Electrical Construction Feyen Zylstra is..

Learn More

Trident Medical Center Surgery Addition and Renovation

07/16

Trident Medical Center Surgery Addition and Renovation Trident Medical Center Surgery Addition and Renovation Electrical..

Learn More

NDA Healthcare

07/01

NDA Healthcare NDA Healthcare Electrical Healthcare Renovation Project Feyen Zylstra completed a 12,784 square foot..

Learn More

Questions about this case study?

FZ logo

Safety. Professionalism. Integrity. It’s how we’ve been shaping the electrical industry with innovative solutions since 1980.

NationalBBlogowin26_W

Useful Links

  • About Us
  • Services
  • Case Studies
  • Careers
  • Blog & News
  • Contact Us

Services

  • Design Services
  • Electrical Solutions

Stay In Touch

Terms and Conditions
Privacy Policy
© 2023 Feyen Zylstra