When Ada Christian Schools was looking to build a new K–8 facility, they came to FZ. The design included creating space for classrooms, a media center, a gymnasium, science labs, a computer lab, and administrative offices.
This fast-tracked project was completed in only 10 months. FZ’s scope of work included the electrical, fire alarm installation, clocks, security, paging, as well as voice and data cabling, and a telephone system. Since Ada Christian was awarded a grant from the Van Andel Institute, Feyen Zylstra worked closely with the representatives from the Institute to design technology systems to meet their specific needs.
Contract Type:
Design Build
Customer:
Dan Vos Construction
Location:
Ada, MI