Ada Christian School
Design Build Electrical Construction
When Ada Christian Schools was looking to build a new K–8 facility, they came to FZ. The design included creating space for classrooms, a media center, a gymnasium, science labs, a computer lab, and administrative offices.
This fast-tracked project was completed in only 10 months. FZ’s scope of work included the electrical, fire alarm installation, clocks, security, paging, as well as voice and data cabling, and a telephone system. Since Ada Christian was awarded a grant from the Van Andel Institute, Feyen Zylstra worked closely with the representatives from the Institute to design technology systems to meet their specific needs.
Contract Type:
Design Build
Customer:
Dan Vos Construction
Location:
Ada, MI
Related Keywords:
Design Build, Education, School, Technology Infrastructure, Systems Installation, Electrical, Construction, Fire Alarm Systems, Paging, Data Cabling, Voice, Communications, Low Voltage Systems, Design, Engineering, Ada Christian School, Design Build Electrical Construction, Design Build Electrical Solutions