Confidential Aerospace Customer Manual Built Tooling Line
When our customer was looking for new electrical wiring on their high-rate manual build tooling line, we were up to the task. In addition to installing the electrical wiring for the line that manufactures 737 engine inlets, we installed the data communication system, and both primary and secondary distribution systems for the facility.
With over 4,000 manpower hours packed into just eight weeks, our team successfully finished the project on a highly compressed work schedule. An onsite prefabrication station helped propel the schedule forward as well as our ability to solve many design issues on premise.
According to our HITT, “FZ’s assistance in delivering fabricated material to the project was paramount in our ability to deliver an operational assembly line to the client ahead of schedule. We truly appreciate FZ’s efforts.” Our commitment to this project has led HITT to award FZ featured subcontractor status.
Customer:
HITT Contracting
Location:
South Carolina
Related Keywords:
Electrical service, Prefabrication, Data Communication System, Aerospace Customer, Primary Distribution Systems, Secondary Distribution Systems