FZ_logomark_4x-min
FZ_Endeavor_logo lockup_4x-min
  • About Us
  • Services
        • Electrical Innovation

          Talented electricians, technicians, and engineers customize comprehensive electrical solutions.

          Learn More
        • Electrical Services

          Electrical solutions from large-scale projects to routine maintenance.

          Learn More
  • Resources
        • Case Studies

          Over 40 years of experience solving our customer’s most complex problems.

          Learn More
        • Materials

          Industry insight and capabilities designed for success.

          Learn More
  • Careers
  • Blog & News
  • Contact
  • Design Engineering
  • VDC
  • Manufacturing
  • DO NOT DELETE THIS – Should be last item always
  • Electrical Solutions
  • Systems Solutions
  • Audio Visual Solutions
  • Outdoor Solutions
  • DO NOT DELETE THIS – Should be last item always
  • IIoT & Digital Solutions
  • Industrial Networking & Cyber Security
  • Factory Automation & Robotics
  • Panel Build
  • DO NOT DELETE THIS – Should be last item always

Embassy Suites Hotel

December 17, 2019

Embassy Suites Hotel

Embassy Suites Hotel

Design Assist Electrical Contractor

Feyen Zylstra is to thank for Nashville’s ever-changing skyline becoming more and more impressive. Our team is providing the complete electrical scope on the 866,000 square foot, twin tower, dual brand hotel situated in downtown Nashville, TN. The two towers will share a common podium up to the 4th floor, with an Embassy Suites Hotel on one side and a 1 Hotel on the other. The Embassy Suites tower will be 30 stories with over 500 guest rooms while the 18-story 1 Hotel includes over 200 guest rooms.

What started out as a tricky situation — the hotel brand changing after site work had started — now has the foundation for being one of Nashville’s most beautiful buildings. With the brand change happening during the project, all of the floor plans and finishes changed while the expedited schedule remained the same.

Our team’s Design Assist expertise, prefabrication abilities, and past experience on similar tight-scheduled high-rise projects make us the ideal project partner.

Contract Type:
Design Assist

Customer:
Yates Construction

Location:
Nashville, TN

Related Keywords:
Commercial, Electrical Construction, Electrical, Hotel, Hospitality, Design Assist, Design Services, Prefabrication, Fabrication, Prefab, High-Rise, Embassy Suites Hotel

Related Case Studies

interior of vos glass

Vos Glass

01/19

Vos Glass Vos Glass For over 40 years, Vos Glass has provided top-of-the-line, professional glazing..

Learn More
transformer oil study

Local Food & Beverage Manufacturer

05/06

For many years, our team has been providing ongoing preventative maintenance services for their manufacturing..

Learn More

Bradford White Preventative Maintenance

01/14

FZ performs preventative maintenance for Bradford White in order to extend equipment lifespan, improve production,..

Learn More

Graphic Packaging International

12/15

FZ is Graphic Packaging's in-house data partner, providing preventative maintenance, network cabling, and fiber installation..

Learn More
electrical and design assist for GCRMC

Gerald Champion Regional Medical Center

12/02

FZ served as a Design Assist partner and electrical lead on Gerald Champion Regional Medical..

Learn More

MidMichigan Health

11/15

As a Design Assist partner, FZ provided all of the lighting solutions on MidMichigan Health’s..

Learn More
Board room - av solutions

Greenleaf Trust

10/19

FZ designed, programmed, and installed the new Audio Visual system for Greenleaf Trust's Trading Center,..

Learn More
Mercantile Bank in Grand Rapids | Emergency power system

Mercantile Bank Emergency Power System

09/14

With the nature of their work hinging on secure and consistent power, Mercantile Bank decided..

Learn More
Protestant Theological Seminary entrance

Protestant Reformed Seminary

09/03

When the Protestant Reformed Seminary needed help updating their antiquated AV system, they turned to..

Learn More
automotive manufacturer

Automotive Part Manufacturer

09/02

FZ has served as a dedicated partner for a local automotive part manufacturer providing controls,..

Learn More

Questions about this case study?

Feyen Zylstra_logo lockup_4x-min

Safety. Professionalism. Integrity. It’s how we’ve been shaping the electrical industry with innovative solutions since 1980.

Useful Links

  • About Us
  • Services
  • Case Studies
  • Careers
  • Blog & News
  • Contact Us

Services

  • Electrical Innovation
  • Electrical Services

Stay In Touch

Terms and Conditions
Privacy Policy
© 2019 Feyen Zylstra