FZ_logomark_4x-min
FZ_Endeavor_logo lockup_4x-min
  • About Us
  • Services
        • Electrical Innovation

          Talented electricians, technicians, and engineers customize comprehensive electrical solutions.

          Learn More
        • Electrical Services

          Electrical solutions from large-scale projects to routine maintenance.

          Learn More
  • Resources
        • Case Studies

          Over 40 years of experience solving our customer’s most complex problems.

          Learn More
        • Materials

          Industry insight and capabilities designed for success.

          Learn More
  • Careers
  • Blog & News
  • Contact
  • Design Engineering
  • VDC
  • Manufacturing
  • DO NOT DELETE THIS – Should be last item always
  • Electrical Solutions
  • Systems Solutions
  • Audio Visual Solutions
  • Outdoor Solutions
  • DO NOT DELETE THIS – Should be last item always
  • IIoT & Digital Solutions
  • Industrial Networking & Cyber Security
  • Factory Automation & Robotics
  • Panel Build
  • DO NOT DELETE THIS – Should be last item always

Lifeway Christian Resources

September 27, 2019

Lifeway Christian Resources

Lifeway Christian Resources

Design Assist Electrical Contractor

Feyen Zylstra was chosen to complete all of the electrical work and audio visual rough-in for the new Lifeway Christian Resources headquarters. The nine-story, 250,000 square foot office space includes a four-story, 250,000 square foot parking garage. The project posed a very aggressive schedule and heavy coordination with other trades, but our team’s extensive preplanning and prefabrication capabilities allowed the project to stay ahead of schedule.

Starting with design, our Virtual Design and Construction (VDC) team put together a detailed layout for the facility which allowed 7,000 hours to be taken off the project site. Utilizing our prefabrication capabilities, we prefabricated everything from panel builds to branch circuit home run racks, all of the in-wall MC and box rough-ins, over 300 lighting control device enclosures, a 4,000 amp tap box enclosure for the busway, and multiple feeder conduit boxes and enclosures.

We also designed and prefabricated eight panel build assemblies with troughs on top, as well as two transformer panel skid builds. The panel builds were completely prewired with a single point of termination allowing for a simple and efficient installation.

Contract Type:
Design Assist

Customer:
Skansa

Location:
Nashville, TN

Related Keywords:
Electrical, Construction, Design Assist, Design Engineering, Garage, Preplanning, Preconstruction, Prefabrication, Fabrication, VDC, Virtual Design and Construction, Lighting, Lighting Control, Panel, Panel Build, Office, Design, Prefab, Commercial, Cost Savings of Design Assist, U.L. Panel, Lifeway Christian Resources, Nashville Electrical Contractor, Nashville Electrical Design Build Partner, Nashville Electrical Design Engineering

Related Case Studies

interior of vos glass

Vos Glass

01/19

Vos Glass Vos Glass For over 40 years, Vos Glass has provided top-of-the-line, professional glazing..

Learn More
transformer oil study

Local Food & Beverage Manufacturer

05/06

For many years, our team has been providing ongoing preventative maintenance services for their manufacturing..

Learn More

Bradford White Preventative Maintenance

01/14

FZ performs preventative maintenance for Bradford White in order to extend equipment lifespan, improve production,..

Learn More

Graphic Packaging International

12/15

FZ is Graphic Packaging's in-house data partner, providing preventative maintenance, network cabling, and fiber installation..

Learn More
electrical and design assist for GCRMC

Gerald Champion Regional Medical Center

12/02

FZ served as a Design Assist partner and electrical lead on Gerald Champion Regional Medical..

Learn More

MidMichigan Health

11/15

As a Design Assist partner, FZ provided all of the lighting solutions on MidMichigan Health’s..

Learn More
Board room - av solutions

Greenleaf Trust

10/19

FZ designed, programmed, and installed the new Audio Visual system for Greenleaf Trust's Trading Center,..

Learn More
Mercantile Bank in Grand Rapids | Emergency power system

Mercantile Bank Emergency Power System

09/14

With the nature of their work hinging on secure and consistent power, Mercantile Bank decided..

Learn More
Protestant Theological Seminary entrance

Protestant Reformed Seminary

09/03

When the Protestant Reformed Seminary needed help updating their antiquated AV system, they turned to..

Learn More
automotive manufacturer

Automotive Part Manufacturer

09/02

FZ has served as a dedicated partner for a local automotive part manufacturer providing controls,..

Learn More

Questions about this case study?

Feyen Zylstra_logo lockup_4x-min

Safety. Professionalism. Integrity. It’s how we’ve been shaping the electrical industry with innovative solutions since 1980.

Useful Links

  • About Us
  • Services
  • Case Studies
  • Careers
  • Blog & News
  • Contact Us

Services

  • Electrical Innovation
  • Electrical Services

Stay In Touch

Terms and Conditions
Privacy Policy
© 2019 Feyen Zylstra