FZ logo
FZ Endeavor logo
  • About Us
  • Services
        • Electrical Innovation

          Talented electricians, technicians, and engineers customize comprehensive electrical solutions.

          Learn More
        • Electrical Services

          Electrical solutions from large-scale projects to routine maintenance.

          Learn More
  • Resources
        • Case Studies

          Over 40 years of experience solving our customer’s most complex problems.

          Learn More
        • Materials

          Industry insight and capabilities designed for success.

          Learn More
  • Careers
  • Blog & News
  • Contact
  • Design Engineering
  • VDC
  • Manufacturing
  • DO NOT DELETE THIS – Should be last item always
  • Electrical Solutions
  • Systems Solutions
  • Audio Visual Solutions
  • Outdoor Solutions
  • DO NOT DELETE THIS – Should be last item always
  • IIoT & Digital Solutions
  • Industrial Networking & Cyber Security
  • Factory Automation & Robotics
  • Panel Build
  • DO NOT DELETE THIS – Should be last item always

Michigan Turkey Producers

January 8, 2020

Michigan Turkey Producers Stellar

Michigan Turkey Producers Stellar

Food Processing Electrical Integrator

Feyen Zylstra has served as a trusted food processing electrical integrator partner at Michigan Turkey Producers for almost 18 years. When Stellar Construction was hired to build the new employee wellness facility and a new chiller building, FZ’s pre-existing knowledge of the facility and operations made us an ideal project partner. Our team provided the complete electrical package for both new buildings along with the fire alarm installation package and an upgrade to the Evisceration line and the Picker/Scalder lines.

The facility needed to remain fully operational throughout the project with all critical lines being rerouted around construction. A majority of FZ’s work was completed during scheduled one-week and two-week shutdowns in order to minimize interruptions to normal production. Our crews worked around the clock and utilized prefabrication in order to complete the work within the allotted shutdown time.

Prefabrication allowed for less congestion and manpower onsite while ensuring a smoother install of equipment. Everything from cable trays and lighting, to devices and equipment stands were prefabricated in our off-site electrical prefabrication facility and then delivered to the site using just-in-time delivery. We also pre-installed electrical components on the production equipment before it was installed in a different housing facility.

Customer:
Stellar Construction

Location:
Wyoming, MI

Related Keywords:
Electrical, Food Processing, Production, Processing Equipment, FDA, Lighting, Press, Shutdowns, Fire Alarm Installation, Shutdowns, Production, Prefabrication, Prefab, Fabrication, Electrical Service, Michigan Turkey Producers, Food processing electrical integrator, West Michigan electrical contractor, West Michigan electrical services, Food and Bev electrical services

Related Case Studies

University of Michigan Health-West logo

University of Michigan Health-West

05/27

University of Michigan Health-West University of Michigan Health-West Formerly known as Metro Health A 19-Year..

Learn More
Corewell Health logo

Corewell Health Grand Rapids Outpatient Center

05/27

Corewell Health Grand Rapids Outpatient Center Corewell Health Grand Rapids Outpatient Center Low Voltage Partner..

Learn More
Corewell Health logo

Corewell Health Place Building A

05/27

Corewell Health Place Building A Corewell Health Place Building A Healthcare Low Voltage The new..

Learn More
Airplane flying in the sky above on a partly cloudy day.

Confidential Aerospace Customer FGI Project

04/30

Confidential Aerospace Customer FGI Project Confidential Aerospace Customer FGI Project Feyen Zylstra partnered with HITT..

Learn More
Small blue and white airplane from overhead, on top of a light pink background

Confidential Aerospace Customer Stall 10 Project

04/30

Confidential Aerospace Customer Stall 10 Project Confidential Aerospace Customer Stall 10 Project Feyen Zylstra partnered..

Learn More
Airplane Wing over Cloud Sky

Confidential Aerospace Customer Manual Built Tooling Line

04/30

Confidential Aerospace Customer Manual Built Tooling Line Confidential Aerospace Customer Manual Built Tooling Line When..

Learn More
Blue, navy, and white lines with dotted ends forming a technical, wiring-like pattern on top of a teal background.

Confidential Data Center Customer

04/30

Confidential Data Center Customer Confidential Data Center Customer 180MW Greenfield Data Center Feyen Zylstra was..

Learn More
Exterior picture of the Hekman Library

Calvin College Hekman Library

12/18

Calvin College Hekman Library Calvin College Hekman Library Higher Education Structured Cabling Feyen Zylstra was..

Learn More
Cables

Western Michigan University Wireless Upgrade

12/11

Western Michigan University Wireless Upgrade Western Michigan University Wireless Upgrade Higher Education Wireless Upgrade With..

Learn More
Michigan Milk Producers Association’s cutting-edge ethanol production facility in Constantine, MI

Michigan Milk Producers

12/10

Michigan Milk Producers Michigan Milk Producers Sustainable Electrical Solutions Feyen Zylstra is proud to support..

Learn More

Questions about this case study?

FZ logo

Safety. Professionalism. Integrity. It’s how we’ve been shaping the electrical industry with innovative solutions since 1980.

Feyen Zylstra Best and Brightest Winner

Useful Links

  • About Us
  • Services
  • Case Studies
  • Careers
  • Blog & News
  • Contact Us

Services

  • Design Services
  • Electrical Solutions

Stay In Touch

Terms and Conditions
Privacy Policy
© 2023 Feyen Zylstra