FZ_logomark_4x-min
FZ_Endeavor_logo lockup_4x-min
  • About Us
  • Services
        • Industrial Tech

          State-of-the-art technology solutions to strengthen and improve your facility.

          Learn More
        • Electrical Innovation

          Talented electricians, technicians, and engineers customize comprehensive electrical solutions.

          Learn More
        • Electrical Services

          Electrical solutions from large-scale projects to routine maintenance.

          Learn More
  • Resources
        • Case Studies

          Over 40 years of experience solving our customer’s most complex problems.

          Learn More
        • Materials

          Industry insight and capabilities designed for success.

          Learn More
  • Careers
  • Blog & News
  • Contact
  • Design Engineering
  • VDC
  • Manufacturing
  • DO NOT DELETE THIS – Should be last item always
  • Electrical Solutions
  • Systems Solutions
  • Audio Visual Solutions
  • Outdoor Solutions
  • DO NOT DELETE THIS – Should be last item always
  • IIoT & Digital Solutions
  • Industrial Networking & Cyber Security
  • Factory Automation & Robotics
  • Panel Build
  • DO NOT DELETE THIS – Should be last item always

Michigan Turkey Producers

January 8, 2020

Michigan Turkey Producers Stellar

Michigan Turkey Producers Stellar

Food Processing Electrical Integrator

Feyen Zylstra has served as a trusted food processing electrical integrator partner at Michigan Turkey Producers for almost 18 years. When Stellar Construction was hired to build the new employee wellness facility and a new chiller building, FZ’s pre-existing knowledge of the facility and operations made us an ideal project partner. Our team provided the complete electrical package for both new buildings along with the fire alarm installation package and an upgrade to the Evisceration line and the Picker/Scalder lines.

The facility needed to remain fully operational throughout the project with all critical lines being rerouted around construction. A majority of FZ’s work was completed during scheduled one-week and two-week shutdowns in order to minimize interruptions to normal production. Our crews worked around the clock and utilized prefabrication in order to complete the work within the allotted shutdown time.

Prefabrication allowed for less congestion and manpower onsite while ensuring a smoother install of equipment. Everything from cable trays and lighting, to devices and equipment stands were prefabricated in our off-site electrical prefabrication facility and then delivered to the site using just-in-time delivery. We also pre-installed electrical components on the production equipment before it was installed in a different housing facility.

Customer:
Stellar Construction

Location:
Wyoming, MI

Related Keywords:
Electrical, Food Processing, Production, Processing Equipment, FDA, Lighting, Press, Shutdowns, Fire Alarm Installation, Shutdowns, Production, Prefabrication, Prefab, Fabrication, Electrical Service, Michigan Turkey Producers, Food processing electrical integrator, West Michigan electrical contractor, West Michigan electrical services, Food and Bev electrical services

Related Case Studies

transformer oil study

Local Food & Beverage Manufacturer

05/06

For many years, our team has been providing ongoing preventative maintenance services for their manufacturing..

Learn More

Bradford White Preventative Maintenance

01/14

FZ performs preventative maintenance for Bradford White in order to extend equipment lifespan, improve production,..

Learn More

Graphic Packaging International

12/15

FZ is Graphic Packaging's in-house data partner, providing preventative maintenance, network cabling, and fiber installation..

Learn More

Gerald Champion Regional Medical Center

12/02

FZ served as a Design Assist partner and electrical lead on Gerald Champion Regional Medical..

Learn More

MidMichigan Health

11/15

As a Design Assist partner, FZ provided all of the lighting solutions on MidMichigan Health’s..

Learn More
car manufacturing facility

Vehicle Company

10/20

Our team implemented a P2L system that used our Vehicle company’s ERP system to provide..

Learn More
Board room - av solutions

Greenleaf Trust

10/19

FZ designed, programmed, and installed the new Audio Visual system for Greenleaf Trust's Trading Center,..

Learn More
Mercantile Bank in Grand Rapids | Emergency power system

Mercantile Bank Emergency Power System

09/14

With the nature of their work hinging on secure and consistent power, Mercantile Bank decided..

Learn More
Protestant Theological Seminary entrance

Protestant Reformed Seminary

09/03

When the Protestant Reformed Seminary needed help updating their antiquated AV system, they turned to..

Learn More
automotive manufacturer

Automotive Part Manufacturer

09/02

FZ has served as a dedicated partner for a local automotive part manufacturer providing controls,..

Learn More

Questions about this case study?

Feyen Zylstra_logo lockup_4x-min

Safety. Professionalism. Integrity. It’s how we’ve been shaping the electrical and industrial tech industries with innovative solutions since 1980.

Useful Links

  • About Us
  • Services
  • Case Studies
  • Careers
  • Blog & News
  • Contact Us

Services

  • Industrial Tech
  • Electrical Innovation
  • Electrical Services

Stay In Touch

Terms and Conditions
Privacy Policy
© 2019 Feyen Zylstra